CEKA PIPE BRIDGES AND TANK
TEKKEKÖY / CEKA GÜBRE TESİSİ
Location
TÜRKİYE
Starting Date
2024
Finish Date
2024
SCOPE OF WORK
The Ceka Fertilizer Plant project encompasses a 650-ton Steel Construction and Tank Manufacturing and Installation project.
The project generally consists of:
- 13 Pipe Bridges,
- 2 Conveyor Steel Structures,
- Tanks with capacities of 50m³ and 60m³.
All manufacturing and assembly works have been carried out by Çolakoğlu Makine.
All the manufacturing processes within the scope of the project were executed by Çolakoğlu Makine in accordance with technical standards and customer requirements, leveraging its extensive experience in tank and equipment projects, and adhering to quality standards. The entire steel structure of the system and installation operations were provided by Çolakoğlu Makine.