CENGİZ İNŞAAT PROJECTS
1100-1140 LEVEL CEMENTED WASTE FILL STATION
Cengiz İnşaat / Siirt Yeraltı İşletmesi
Location
Türkiye
Starting Date
2020
Finish Date
2021
SCOPE OF WORK
This project is of underground cemented waste filling station for Underground Copper Plant in Siirt, Cengiz İnşaat.
The project in general; consist of main steel structure of paso filler station, upper throat chute, intermediate routing chute, bottom loading chute, grizzly grid and steel grid chassis, aboveground loadcell slurry tank, underground slurry tank, CWF main electric-automation control with pump and pumping pipelines system, slurry tanks and pumping automation system and the plant's hydraulic systems. All designs and manufacturing of the project were realised by Çolakoğlu Makina.