Değerli ziyaretçimiz gizliliğiniz bizim için önemlidir. Çolakoğlu Makina olarak sizlere hizmet verirken yasal düzenlemeler kapsamında bazı kişisel verileriniz işlenmektedir. Çerez politikamızı buradan inceleyebilirsiniz.
PROJECTS
STEEL CONSTRUCTION
IN-WELL PIPE AND OUTBUILDINGS
BALYA KURŞUN ÇİNKO İŞLETMESİ
Location
TÜRKİYE
Starting Date
2023
Finish Date
-0001
SCOPE OF WORK
This project covers the pipelines located inside the 850m deep well drilled to ensure the transfer of ore from underground to above ground. High pressure resistant pipes are used in the project detail and there will be task distributions according to the colors of the pipelines. Pipelines will be used to transfer groundwater, sludge accumulated in the well to meet the needs during construction and production, to transmit air and clean water from above Jul to underground.